Receiving and Delivery
A new School of Medicine central loading dock will be situated
between MSOB (the future site of SIM3), Governor’s Lane and
SIM1 (currently parking lot south of CCSR), and located below grade
to connect to a network of tunnels for transportation of equipment,
materials and personnel. Between 5000 and 5,500 gross square feet,
it will contain eight bays, accommodate the largest 18 wheel tractor
trailer and allow for the consolidation of most waste management
and recycling functions. A combination of new and existing tunnels
will access service elevators in each building. Designed for both
materials movement and building occupants, the tunnels will accommodate
1 and 2-way traffic using motorized cart pullers and tugs, allowing
for the frequent and efficient movement of both small and large
quantities of materials.
Virtually all of the receiving and delivery needs of the School will
be provided through the new central loading dock with the exception
of the few buildings that are not located on the tunnel network,
including MSLS, Lucas, Redwood, PSRL and MSOB. These buildings will
be served at grade at MSLS, in front of MSOB or via the loading dock
service elevator. Finally, there will be limited receiving and delivery
at grade from the Quarry Road extension lots beginning early 2008
to accommodate staging of deliveries where required (e.g. furniture
deliveries) and 20-30 minute drop-off deliveries to the east side
of the School of Medicine campus.
Read
the School of Medicine Materials Handling Report (sunet
ID required) ,May 30, 2006 which provided the basis of design of the new loading
dock.